UW News

September 28, 2006

Bridge comment period extended

The Draft Environmental Impact Statement (EIS) on the SR520 Bridge Replacement and HOV Project comment period has been extended to Oct. 31.

The Evergreen Point Bridge is nearing the end of its useful life and will be replaced by structures that are less vulnerable to damage by storms or earthquakes.

The Draft EIS includes a four-lane alternative, a six-lane alternative , and multiple design options for the six-lane alternative. One of the options would include a new interchange near the Arboretum with a second bridge crossing over UW property to an expanded intersection at Montlake Blvd and Pacific St.

To submit your comments or to download a copy of the EIS, please visit the project Web site: http://www.wsdot.wa.gov/projects/SR520Bridge.