November 9, 2023 SAGE Suite Release Notes

Contents

Subawards

Award Lookup Now Used for Subaward Setup

Subaward requests can now be submitted using SAGE. With the transition to Workday, subawards are now associated with Awards, rather than Funding Actions (FAs). To set up a new subaward, users will search and select their award, and the eGC1 data will default based on the award selected.

subaward request award lookup buttonsubaward request award lookup resultssubaward request award details

Funding Action (FA) Validation and Lookup Removed

Since subawards are now associated with awards, the subaward FA lookup is no longer active or needed, and the validation has been removed. For legacy subawards, the FA fields will continue to display for reference.
subaward request details with F A data

Holds on Award Setup (ASR) and Modification (MOD) Requests

OSP and GCA Can Apply Holds to ASRs and MODs

OSP and GCA can now set and remove holds on ASR and MOD Requests. A new Holds section is available in the left navigation. After saving holds, an entry will display in the Comments & History section of the ASR/MOD.
A S R and MOD holds section

History of Holds Added to Comments & History Section

Campus, OSP, and GCA can view the history of holds activity on the Comments and History section of the ASR or MOD request.
holds data in comments and history section

Holds Banner Displays on ASR and MOD Requests

When holds are applied to an ASR or MOD request, users will now see a banner at the top of the request, alerting them to the hold. The campus banner will be informational only, and highlighted in blue. The OSP and GCA banner will be red, and indicate any action that may be needed before moving the item forward in the workflow.

Campus banner
SAGE holds banner

OSP & GCA banner
SAGE Central holds banner

Required Fields on Award and Budget Setup

Required Fields on SAGE Budget Worksheets

The SAGE Budget worksheet settings have been updated to show an asterisk next to fields that are required for ASR and MOD requests. These fields support the Workday award data needs.
sage budget worksheet settings required fields

In the SAGE Budget Salary and Benefit Costs section, additional help text has been added to remind campus that a person must be entered with the Principal Investigator role to provide the necessary grant PI data to Workday for award setup.
additional heop text for principal investigator requirement

Required Fields on Award Setup Requests

Required fields on the Award Setup Request now display an asterisk next to the field label. When the user clicks in a required field and navigates away, additional red highlighting will draw their attention back to the fields required.
award setup request required fields example

Miscellaneous Maintenance

eGC1 Status Updated to “Awarded” When Awards Are Processed

When awards are set up in Workday and the award setup request is marked as “Processed” in SAGE, the associated eGC1 status will now change from “Approved” to “Awarded.”

OSP Ability to Change the Linked eGC1 on Award Setup Requests

When OSP initiates an ASR and while it is in “OSP Setup” status, OSP can now change the linked eGC1 if an error has been made, prior to sending the ASR to campus. OSP will need to refresh the “Access & Roles” section after changing the eGC1 to see updated eGC1 data.

Modification Start and End Dates Display for Schedule Changes

On Modification Requests, when users select the Schedule Changes category, the “Current Authorized Spending Start Date” and “Current Authorized Spending End Date” fields will be visible and enabled for users to enter the dates. Existing MOD requests already processed with the Schedule Changes category will display the date fields without any dates populated.

Removal of Deny Reason for Requests

An issue was preventing the deny reason on requests from saving properly. Until a full fix can be completed, in the interim, the deny reason field has been removed and OSP or GCA will now enter the reason as a comment instead. The denial reason field will be added back into a future release.

Advance Extension Requests No Longer Show Former Budget Numbers

The former budget numbers no longer display for users on new Advance Extension Requests.

Award Request List Default Set to 25 Rows for OSP and GCA

In order to improve performance and reduce load on systems, the defulat setting of the Award Request List for OSP and GCA will initially show 25 rows instead of 50 rows. Users can still set it to up to 50 rows if needed, for now, but with dome deteriorated performance expected.

Fix: Truncated Comments on Requests with URLs

ASR and MOD request comments with URLs in them now show proper alignment without truncation.

Fix: SAGE Budget Personnel Side Panel Freezes

The SAGE Budget TBD personnel entry has been updated to prevent side panel freezing when users clicked out of fields quickly, prior to SAGE saving the data.

Update: Missing PI Validation Message on Award Setup Requests

The language used on the Award Setup Request Review and Submit page when the SAGE Budget worksheet PI is missing has been updated to direct users back to SAGE Budget to add a worksheet PI.

Fix: Cannot download previous version of attachments on Requests

Users can now select the current or prior version of attachments on ASRs, MOD, and Advance requests.

Fix: Animal Use Protocols Not Always Saving Country Data

An issue with the saving of “Country” data when a new institution was added to Animal Use protocols on the eGC1 has been fixed.

Temporary Change: Advance Tasklist “Processed” Filter Deactivated

Due to performance issues, we have temporarily deactivated the “Processed” status filter on the SAGE Advance Tasklist. While we work on improvements, this temporary solution will protect system performance and mitigate risk. In the meantime, if campus users need to locate a processed advance, they should use Advanced Search and search by either the Advance number or the eGC1 number to find an item.

Please note that SAGE Central filters will not change, but we recommend avoiding filtering for all “Processed” advances until we patch the issue next week.

User Interface Design Component Updates

A required Angular Material version upgrade has been completed, which has slight impacts to the SAGE user interface. The design changes of note include the following:

SAGE Budget, Advances, and Awards Sections: Excess table spacing has been reduced, small font sizes have been increased, and all capital letters on buttons and table headers have been removed to improve readability and accessibility.

SAGE Budget Icons: Subaward and Fabrication worksheet icons have been updated in the left navigation and the Budget Summary section within the Other Costs table. The More Actions menu (three dots) has been replaced with a Delete Worksheet button for Internal, Subaward, and Fabrication worksheets in the left navigation.

user interface design components example